Summer Sneakers No.3 (E)

“Summer Sneakers No.3 – Mariquita”, knit with Wollmeise Twin sock yarn in “Tutu” , size 40/41

Summer  Sneakers No. 3 Mariquita

You need:

  • One skein of Wollmeise 100 % Twin sock yarn, yardage 311 m / 100 g – or use any other 4-ply sock yarn
  • A set of double pointed needles (dpn) size Nr. 2,5 / U.S. size 1,5
  • A cable needle

Pattern:

Main pattern: the charts are read from the right bottom to the left top.

Repeat round  1 to 8.

Empty boxes = knit

ssk = slip two stitches knitwise to the right needle, return to the left needle and knit both stitches through the back of the loops

k2tog = knit two stitches together

k = knit

p = purl

hintenkreuzen = Slip 2 stitches purlwise onto a cable needle, let the cable needle hang in back of your work as you knit the next 2 stiches; then knit stitches off of the cable needle.

vornkreuzen = Slip 2 stitches purlwise onto a cable needle, let the cable needle hang in front of your work as you knit the next 2 stiches; then knit stitches off of the cable needle.

Main pattern

Summer   Sneakers No.3 Chart

Ribbing / Cuff:

Summer  Sneakers No. 3 Mariquita

Loosely cast on 64 stitches, join in a ring and be careful not to twist stitches. Divide the stitches evenly on four needles (16 stitches on each needle).

Knit the following ten rounds as follows:

4k – p2 – k4 – p2 – k4 on each needle.

Leg:

Keep on knitting the cuff ribbing pattern on needle 1 and 4.

In the first round increase 2 stitches on needle 2 and 3, as you need 18 stitches for the cable pattern.

Knit the leg for two repetitions of the main charts or till the desired leg height is reached.

Heel:

Summer  Sneakers No. 3 Mariquita

– Heel Flap –

The heel flap is knit back and forth on needle 1 and 4 for 32 rows (usually half the number of stitches used for the sock).  Knit the first and the last stitch on each side and work the remaining stitches as they show (knit on right side, purl on wrong side).

– Heel Turn –

A short-row shaping is used to form the heel turn. It creates a rounded base on the heel.

Knit to the middle on the right side of the heel flap. Set stitch marker.

Work the heel turn as follows:

(1) RS (from center): K1, ssk, K1, turn

(2) WS: Sl1, P3, P2tog, P1, turn

(3) RS: Sl 1, K4 (to within 1 st of gap), ssk, 1 M re, turn

(4) WS: Sl1, P5 (to within 1 st of gap), P2tog, P1, turn

Continue knitting this way, until all side stitches are worked. End on WS – turn and knit to the stitch marker.

Now the stitches are divided on 4 dpn (with 9 stitches on each “heel needle”).

– Gusset –

Start knitting in rounds again, the beginning of the round is now at the center back (where you set the stitch marker).

Needle 1: Knit the 8 heel stitches and pick up 16 stitches from the side of the heel flap = 25 stitches.

Needle 2 and 3: Work in main pattern.

Needle 4: Pick up 16 stitches from the side of the heel flap and knit the remaining 8 heel stitches = 25 stitches.

Work the gusset decrease as follows:

R 1:

Continue knitting in main pattern (stockinette stitch on needle 1 and 4, main pattern on needle 2 and 3). In the first decrease round knit through the back loop of the picked up stitches to create a twisted stitch and avoid gaps.

R2 (decrease round):

Nd. 1: Knit to last 3 stitches, K2tog, K1

Nd. 2 and 3: work in main pattern

Nd. 4: K1, SSK, knit remaining stitches.

Repeat rounds 1 and 2 until there are again 16 stitches on each heel needle.

Foot:

Continue knitting in main pattern on the pattern needles and in stockinette stitch on the other needle 1 and 4 until desired length is reached (here ~ 21 cm from heel).

Toe:

Summer  Sneakers No. 3 Mariquita

The toe is knit in stockinette stitch.

In the first row the additional cable stitches on the cable needles have to be reduced to 16 stitches. Decrease 2 stitches on needle 2 and on needle 3 by knitting two stitches together = 16 stitches on each needle.

Round 1:

Knit around.

Round 2:

1. needle: knit until there are 3 stitches left, k2tog, knit the last stitch

2. needle: knit one stitch, SSK, knit the remaining stitches

3. needle: knit until there are 3 stitches left, k2tog, knit the last stitch

4. needle: knit one stitch, SSK, knit the remaining stitches

Continue in that way until there are 5 stitches remaining on each needle.

Finishing:

Use the kitchener stitch to graft the toe closed and weave in ends.

Tipp:

Adjust to other sizes by using more or less stitches on needle 1 and 4 or go down one needle size.

Summer  Sneakers No. 3 Mariquita

Summer  Sneakers No. 3 Mariquita

Summer  Sneakers No. 3 Mariquita

Summer Sneakers No.3 at Ravelry:

Hinterlasse eine Antwort